About Me
My Story
asdfQuisque volutpat condimentum velit. Class aptent taciti sociosqu ad litora torquent per conubia nostra, per inceptos himenaeos.
Nam nec ante. Sed lacinia, urna non tincidunt mattis, tortor neque adipiscing diam, a cursus ipsum ante quis turpis. Nulla facilisi ut fringilla.
My Background
Education
Bachelor of Science in Civil Engineering
Leyte institute of Technology, Tacloban City Philippines
Secondary Education
Samar State polytechnic College, Catbalogan Samar
Elementarty education
Matalud Elementary School, Matalud San Jorge Samar
Computer Skills
Proficient in Various Software Applications as MS Word, MS Excel, MS Power-point )
AutoCAD Drafting
Primavera P3 Planning and Scheduling
Other Skills
With UAE, Qatar, Taiwan and Philippines Driving License
AWARDS Accomplishments:
Certificate of Merit:
For Excellent Performance and LEADERSHIP
HYUNDAI DEVELOPMENT ENGINEERING CO. Ltd. Taiwan High-speed Rail Construction C230
TRAININGS SEMINARS ATTENDED
STAAD Pro. (Computer AIDED Structural Analysis and DESIGN)
June 21 to July 12, 2006
MICROCADD Technologies Co. Inc
889P Paredes St. Sampaloc Manila
AutoCAD 2006 Draughting for the professional
Suite 02 Don Lorenzo Building
889P Paredes St. Sampaloc Manila
AutoCAD 2002 Draughting witth Color Rendering
July 10-27 2003
MICROCADD Technologies Co. Inc
889P Paredes St. Sampaloc Manila
FORMWORKS
March 23-27 1998
Construction Development Center
Dasmarinas Cavite Philippines
Work Experience
Construction Projects Engineers
Jan 2018 to Present YGNIM Const. Co.
Responsible for managing and supervising Projects: Project Planning and Scheduling, Materials allocation, manpower management, Equipment programming and distribution. Accountable for project progress, Quality implementation and ensure workforce safety trough-out the construction duration.
Sr. Civil Superintendent/Deputy Project Manager Al jabber Energy Services Inc.
January 2009 to Dec. 31 2017 P/O. Box 47467, Abu Dhabi City UAE
- ZADCO EPC II CW (Civil Works at ZADCO oilfield Man-made Island
- RUWAIS SULPHOR HANDLING TERMINAL II Project (Completed)
- Ruwais Refinery Expansion II Project (Completed)
- Green Diesel Project (TAKREER)- Sal Ruwais, Abu Dhabi, UAE (Completed)
- Responsible for the Site Construction operation, reporting to the Sr. Construction Manager. Controlled manpower, equipment distribution and work execution, Ensured that all activities was carried out as per construction standard
- Checked and evaluated monthly construction look ahead schedule, monitored the on-going activities, ensured that target progress are achieved.
- Conducted weekly company staff meetings, heard manpower issues for safety, work quality, and discussed expected work related problems, provided solutions to issues that can be solved in site levels, and discussed to Management matters that required the Company’s top management decision
- Attended Clients management construction progress meetings, represented the company for construction issues of the project. Assured the client of company’s dedication towards completion of the project
Section Engineer, Civil Cooperation of Japan and Algeria Co.
March 2008 to Jan 2009 (COJAAL Co., Setif, Algeria 600KM North South Auto-route (Expressway)
- Headed the team in the Construction of Bridges and box culverts crossing and along the expressway.
- Prepared job related documents and secured work permits prior to start major work
- Monitored the activities and ensured target progress are being achieved through Timely provisions of equipment materials, and manpower. Discussed the progress obstacles and addressed the problems immediately.
- Attended client management meetings and represented the company for construction concerns, presented pertinent problems encountered on site, listened to clients’ needs and proposed solutions to solve site difficulties as per construction standards.
Project Engineer Khalid Bin Al Sowaidi Co. Doha Qatar
Oct 2006- Jan 2008 RAS LAFFAN Industrial Roads Projects
GTC/242 New Roads and Corridors
RASGASRL3 QATAR GAS2 Camp facilities and Road works
- Planned and executed site activities to fulfill projects schedule in conformity to construction standards on quality, safety and time frame
- Allocated materials and equipment for the site and ensured deliveries of such ahead of the required activities
- Conducted site construction meetings with all the construction staff and addressed site issues that is hindering the construction progress. Ensured welfare of the construction force .through daily communication with the department concerned
- Ensured that quality, Safety, and progress record are up to date and properly reported and kept.
- Ensured that all construction records are being acknowledged and signedm by the proper clients representatives.
Viaduct Civil Engineer Hyundai Eng’g Co., Miaoli, Taiwan
August 2002- June 2006 Taiwan High-speed Railway Project LOT C230 and C240 44.7km (Tunnels, Overhead Viaducts, Bridges)
(Over-head viaducts construction method (FCM, MSS, and FSM)
- Spearheaded the earthworks, bored piling works, foundation pile caps, pier stem and the overhead viaducts works
- Supervised post tensioning works for cast in place viaducts
- Ensured approved plans and details are fully implemented, and that target schedules are being achieved safely and in conformity of quality standards
- Improvised and introduced manual pump for filling up honey comb and made the non-shrink grouting activity with ease as per construction standard
- Coordinated with TAIWAN High-speed Railway representatives day-in day-out in the course of the project duration.
Civil Site Engineer HANJIN Heavy Industries, Manila Philippines
March 2000- July 2002 Metro Manila Philippines
Construction MRT Line II (Marikina to Divisoria Line) Overhead Viaduct and STATIONS
- Headed the team for the construction of foundation, (sheet piling and bored piling works) Pile Caps Pier Stem and over-head viaducts
- Supervised the construction of Cubao MRT Station, Anonas MRT Sation
- Task to preparer Stressing report, Monitor accomplishment ensured that work was done as per approved construction Drawings
- Coordinated with the Project inspectors day-in day-out for the approval of daily construction activities and ensured that all works are accepted and signed by the proper MRT II Authorized representative.
- Attended Monthly Construction meetings with the Client and represented the Company for projects concerns.
Constuction Engineer RJA Builders, Manila Philippines
Jan 1998- Feb 2000
- Design and Construction of 2 Storey Residential Building with roof deck
Brgy. San Jose, Tacloban City
- Design Construction and completion of Single Storey Residential building
Calanipawan Road, Tacloban City
- Canal Lining and Service Road Improvement at Guinaroan RIS (National Irrigation Administration,
Guinarona, Dagami, Leyte
- Prepared Bid Documents, attended Pre bids and opening of Bids for government projects
- Managed Site, allocated manpower, equipment and materials achieved target schedule on time
- Made sure that the completed works are as per standard and accepted by the Client
Civil Site Engineer M.S, Al Suwaidi Co. Al Jubail, KSA
Dec 1996- Dec 1997
- Saudi Aramco Asphalt Road Pavement Repair and Maintenance, inside Rabigh Refinery
- Diesel Tank Repair, Replacement of Tank roof, replacement of corroded floor plates, painting works, installation
of Sacrificial Anodes
- Headed the construction and maintenance of the Saudi Aramco Tanks T&I inside Rabigh Refinery. (Diesel Tank, Naphtha Tank)
- Prepared Work Schedule, monitored and Supervised the repair and maintenance work
- Ensured that the work was I n accordance with the approved drawings and met the Saudi Aramco quality standard
- Prepared service orders for contractor work based on the General Contracts of the MS AL SUWAIDI for the ARAMCO TANKS T&I
- Supervised the 25 Kilometer Potable water pipeline from trenching, sand bedding pipe laying, construction of manholes and conducted pipeline hydrotest.
Project Engineer Federal Builders Corp., Philippines
Sep. 1995- Jul. 1996
Construction of EVERCREST White Cove resort, Nasugbo, Batangas, (7-floors Hotel Buildin, and 18 units luxury Apts)
- Headed the construction of 7-Storey Resort Hotel from earthwork, foundation works, structural and finishing activities
- Reported to the Site manager the daily site activities and accomplishments
- Supervised pile driving works and ensured proper log and records of piling activities
- Supervised mountain slope protection works, cut and fill mountain slope to the desired terrain.
- Attended construction meetings with the clients
Civil Site Engineer Al Emad Comm’l Contg. Co. Jubail KSA
Dec. 1991- Dec. 1993
- Al mutabaghani Pre-cast Villas, 10 units pre-cast Villas, jubail Industrial city
- Al Thabit Gasoline Station, Jubail Industrial City
- Al Naim Villas, 13 units, Jubail Industrial City
Contact us now
E-Mail: fjazmines67@gmail.com
Telefon: +64 948 139 5384
Address: San Jose Street, Poblacion District IV,
Burauen Leyte